NEW QUESTION # 12
Which scheduling parameters are used in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Start date
  • B. Scheduling indicator
  • C. Scheduling period
  • D. Factory calendar

Answer: A,C


NEW QUESTION # 13
Which component is used to display data in the Technical Object Breakdowns and Technical Object Damages app?

  • A. SAP Lumira Designer
  • B. SAP Asset Strategy and Performance Management
  • C. SAP Predictive Analysis
  • D. SAP S/4HANA Core Data Services

Answer: D

Explanation:
Maintenance Processing - Basic Functions


NEW QUESTION # 14
Which are the prerequisites for Inspection Checklist Processing? Note: There are 2 correct answers to this question

  • A. QM inspection plan with assigned inspection characteristics
  • B. Master inspection characteristics assigned to PM task list operations
  • C. Classification data assigned to a technical object
  • D. Inspection point type assigned to the task list header

Answer: A,C

Explanation:
* This is required to define the inspection scope and the checklist type for the technical object. The inspection plan must be classified with the same class as the technical object and have matching characteristic values1.
* Classification data assigned to a technical object: This is required to identify the relevant inspection plan and checklist type for the technical object. The technical object must be classified with the same class as the inspection plan and have matching characteristic values1.
The other options are not correct because:
* Inspection point type assigned to the task list header: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to define inspection points for the checklist items2.
* Master inspection characteristics assigned to PM task list operations: This is not a prerequisite for inspection checklist processing, but an optional setting that allows the user to use master inspection characteristics as checklist items2.
References:
1: Explaining Inspection Checklists - SAP Learning 2: Generating Inspection Checklists | SAP Help Portal


NEW QUESTION # 15
What are characteristics of the structure indicator?
Note: There are 2 correct answers to this question.

  • A. It restricts the number of hierarchical levels to no more than 6.
  • B. It sets the hierarchy levels of the functional location structure.
  • C. It limits the types of characters in the edit mask to Alpha and Numeric.
  • D. It defines the allowed characters for a functional location.

Answer: B,C

Explanation:
Technical Objects


NEW QUESTION # 16
You want to have several plan dates calculated in a maintenance plan.Which scheduling parameter do you use?

  • A. Call horizon
  • B. Scheduling indicator
  • C. End Date for Scheduling
  • D. Scheduling period

Answer: D

Explanation:
To have several plan dates calculated in a maintenance plan, you use the scheduling period parameter. The scheduling period defines the time interval for which the system calculates the planned dates for the maintenance plan. For example, if you enter 12 months as the scheduling period, the system calculates the planned dates for the next 12 months from the current date. You can also specify the end date for scheduling, which is the last date for which the system calculates the planned dates. The scheduling indicator determines how the system calculates the planned dates based on the cycle, the shift factor, and the tolerance. The call horizon defines the percentage of the cycle that must be expired before the system generates a call object (such as a maintenance order or notification) for the planned date.
References: 1: Scheduling Maintenance Plans - SAP Learning 2: Maintenance Plan Scheduling Parameters - SAP Online Help


NEW QUESTION # 17
How can you assign a material BOM to a piece of equipment?

  • A. Via field model number in the equipment master
  • B. Via field construction type
  • C. Via creation of an equipment BOM
  • D. Via material BOM header in the serialization data

Answer: B

Explanation:
A material BOM is a list of components that make up a material. It can be used to describe the structure and composition of a product or a spare part. A material BOM can be assigned to one or more technical objects, such as equipment or functional locations, to define the materials required for maintenance activities1.
One way to assign a material BOM to a piece of equipment is via the field construction type in the equipment master. The construction type is a material number that identifies the material BOM for the equipment. By entering the construction type in the equipment master, the system automatically assigns the material BOM to the equipment2.
The other options are incorrect because:
* Via field model number in the equipment master: The model number is a material number that identifies the material of the equipment itself, not the material BOM. It is used to create an equipment BOM, which is a list of components that are installed on the equipment. An equipment BOM can be different from a material BOM, as it can reflect the actual configuration of the equipment2.
* Via material BOM header in the serialization data: The serialization data is a view in the material master that contains information about the serial numbers of the material. It is not related to the material BOM or the equipment assignment3.
* Via creation of an equipment BOM: The creation of an equipment BOM is a different process from the assignment of a material BOM. An equipment BOM can be created from a material BOM, but it does not automatically assign the material BOM to the equipment. An equipment BOM can also be created manually or copied from another equipment2.
References: 1: Using Bills of Materials (BOMs) - SAP Learning 2: SAP PM Bills of Material Tutorial - Free SAP PM Training - ERProof 3: Serialization Data (SAP Library - Material Master (LO-MD-MM))


NEW QUESTION # 18
Which features can the planner use in a multiple-counter plan? Note: There are 2 correct answers to this question.

  • A. Multiple time-based cycles
  • B. Change Repeat Factor
  • C. Cycles with different dimensions
  • D. Maintenance Strategy

Answer: C

Explanation:
Preventive Maintenance


NEW QUESTION # 19
Which of the following is a prerequisite for external refurbishment?

  • A. Activate the subcontracting indicator in an external activity.
  • B. Select the material group for externally refurbished materials.
  • C. Assign an external work center to a maintenance order operation
  • D. Define the order type for external refurbishment.

Answer: A

Explanation:
External refurbishment is the process of sending defective or worn-out spare parts to an external vendor for repair or replacement. To carry out this process, you need to create a maintenance order with an external operation that has the subcontracting indicator activated. This indicator allows you to create a purchase requisition and a purchase order for the external service. The external operation also requires an external work center, a control key, and a material component with the valuation type of the defective part. The order type for external refurbishment is not a prerequisite, but a configuration option that can be used to differentiate the process from internal refurbishment. The material group for externally refurbished materials is not relevant for the process, as the material master data is not changed by the refurbishment. The assignment of an external work center to a maintenance order operation is necessary, but not sufficient, for external refurbishment. You also need to activate the subcontracting indicator in the external activity. References:
* Explaining Refurbishment of Spare Parts, section "Refurbishing Spare Parts Externally"
* Refurbishment of Repairable Spares: Integration between SAP-PM and SAP-MM, section "4.2 External Refurbishment: Major Steps"


NEW QUESTION # 20
Which scheduling parameters are used in a multiple-counter plan?
Note: There are 2 correct answers to this question.

  • A. Start date
  • B. Scheduling indicator
  • C. Scheduling period
  • D. Factory calendar

Answer: A,C

Explanation:
Preventive Maintenance


NEW QUESTION # 21
You want to schedule a performance-based maintenance plan. Which parameters are mandatory? Note: There are 2 correct answers to this question

  • A. Scheduling period
  • B. Counter overflow reading
  • C. Start counter reading
  • D. Estimated annual performance

Answer: C,D

Explanation:
To schedule a performance-based maintenance plan, you need to specify the start counter reading and the estimated annual performance of the equipment or functional location. The start counter reading is the initial value of the counter assigned to the maintenance plan. The estimated annual performance is the expected value of the counter for one year. These parameters are used to calculate the maintenance cycle and the due date for the maintenance plan. The scheduling period and the counter overflow reading are optional


NEW QUESTION # 22
Where can you see the results of the material availability check for maintenance orders? Note: There are 2 correct answers to this question.

  • A. In the list editing (single-level) for maintenance orders
  • B. Within a maintenance order
  • C. In the report Material: Where-Used List
  • D. In the material reservation list in inventory management

Answer: B,C

Explanation:
Maintenance Processing - Basic Functions


NEW QUESTION # 23
What are characteristics of the Preparation and Scheduling phase within phase-based maintenance?
Note: There are 2 correct answers to this question.

  • A. The order moves to the Preparation phase once it is approved and released.
  • B. The configuration of the order type decides whether you use Resource Scheduling or not.
  • C. If you use the Resource Scheduling apps, you always dispatch orders and operations.
  • D. Maintenance Planning Buckets give you a list of non-approved notifications.

Answer: A,C

Explanation:
Maintenance Processing - Advanced Functions


NEW QUESTION # 24
What do you have to consider regarding a cross-plant planning scenario?

  • A. Only a maximum number of five maintenance plants can be assigned to a planning plant.
  • B. It is only possible within the same company code.
  • C. Multiple planning plants are assigned to a maintenance plant (m: 1).
  • D. Multiple maintenance plants are assigned to a planning plant (n: 1).

Answer: D

Explanation:
A cross-plant planning scenario is a special planning process that allows you to carry out material requirements planning for various plants centrally. This facilitates the production of a product in another plant and it also guarantees a smooth flow of materials between different plants. In a cross-plant planning scenario, you can assign multiple maintenance plants to a planning plant (n: 1) or multiple planning plants to a maintenance plant (m: 1). This means that you can plan and execute maintenance orders in different plants using a common planning plant or a common maintenance plant. There is no limit on the number of maintenance plants that can be assigned to a planning plant, so answer B is incorrect. A cross-plant planning scenario is also possible across different company codes, as long as the plants belong to the same controlling area. Therefore, answer D is also incorrect. References: Cross-Plant Planning | SAP Help Portal and SAP S
/4HANA Asset Management: Plants from a Maintenance ... - SAP PRESS


NEW QUESTION # 25
Which of the following is a prerequisite for external refurbishment?

  • A. Activate the subcontracting indicator in an external activity.
  • B. Select the material group for externally refurbished materials.
  • C. Assign an external work center to a maintenance order operation.
  • D. Define the order type for external refurbishment.

Answer: A

Explanation:
Maintenance Processing - Advanced Functions


NEW QUESTION # 26
You want to assign components to a General Maintenance Task List. What are prerequisites for assigning material components to a task list operation? Note: There are 2 correct answers to this question

  • A. Assign a piece of equipment with allocated material BOM to a task list operation.
  • B. Assign the header material of a material ROM to the assembly field of the task list header
  • C. Assign the header material of a material BOM as assembly to a task list operation.
  • D. Assign the BOM usage for free assignment of material in Customizing

Answer: C,D


NEW QUESTION # 27
Where can the maintenance planner perform a material availability check? Note: There are 2 correct answers to this question?

  • A. Via the SAP Fiori epp "Manage Maintenance Planning Buckets"
  • B. Within the SAP Fion-based background job
  • C. Via the SAP Fiori app "Maintenance Scheduling Board"
  • D. Via the SAP Fiori app "Manage Maintenance Order List"

Answer: B,D


NEW QUESTION # 28
Which of the following are standard functionalities of SAP Service and Asset Manager (formerly SAP Asset Manager)? Note: There are 3 correct answers to this question?

  • A. ESRI Maps
  • B. Work orders and operations
  • C. Cost analytics
  • D. Technical objects
  • E. Breakdown analytics

Answer: A,B,D

Explanation:
SAP Service and Asset Manager is a predictive asset management application that supports both maintenance and service technicians. Using this app, you can manage work orders, notifications, condition monitoring, material consumption, time management, and failure analysis1.
Some of the standard functionalities of SAP Service and Asset Manager are:
* Technical objects: You can view and edit technical objects such as functional locations, equipment, and measuring points. You can also create new technical objects or link existing ones to work orders or notifications2.
* Work orders and operations: You can view and edit work orders and operations assigned to you or your team. You can also create new work orders or operations, or confirm them as completed2.
* ESRI Maps: You can view the location of your work orders, notifications, and technical objects on an interactive map powered by ESRI. You can also use the map to navigate to your destination or search for nearby assets2.
The other options are not standard functionalities of SAP Service and Asset Manager. Cost analytics and breakdown analytics are features of SAP Intelligent Asset Management, which is a cloud-based solution that integrates with SAP Service and Asset Manager toprovide advanced insights and recommendations for asset performance3. References: 1: SAP Service and Asset Manager Overview 2: SAP Service and Asset Manager User Guide 3: SAP Intelligent Asset Management Overview


NEW QUESTION # 29
......